Panel & Service Upgrades
Electrical Panel & Service Upgrades in San Diego
If you're adding an EV charger, heat pump, solar or a remodel, your panel may not have the room or capacity. We figure out what you actually need and handle the upgrade, including the utility coordination.
What this work includes
- Main panel replacement
- 100A to 200A+ service upgrades
- Subpanels for garages, ADUs and additions
- Load calculations to size the upgrade correctly
- Utility coordination for disconnect and reconnect
Common problems we solve
- No open breaker spaces for new circuits
- An older panel that's worn, corroded or overheating
- Planning an EV charger, heat pump, solar or battery
- Lights dimming when large appliances start
How it works
- 1.We review your current panel and the loads you plan to add
- 2.We run a load calculation and recommend the right size
- 3.We handle the permit and coordinate with the utility
- 4.We schedule the power-down, install the panel and restore service
What we'll cover on your consult
- Your current panel, its age and any known issues
- Loads you plan to add now and later
- Utility coordination and the power-down window
Emergency service calls
Power out, breakers tripping or something unsafe? We take emergency service calls across San Diego County and Orange County — call or text and we'll respond as fast as we can.
Frequently asked questions
How long will my power be off?
The power is typically off for part of the day while the panel is swapped. We'll confirm the expected window before the work is scheduled.
Do I need a 200A upgrade for an EV charger?
Not always. A load calculation shows whether your existing service can handle it, sometimes with load management instead of a full upgrade.
